Encevra Research Round 37: When the Contract Changed After Signing: Event-Date Resolution, Register-Anchored Completeness, and Stale Registers in Multi-Witness Contract Audits
Date: 2026-10-28
Research lab: Encevra Research
Short code: TDR-37 (Temporal Drift and Post-Execution Supersession)
Primary tracks: Track 1 (Evidence, Provenance, and Change), Track 2 (Selective Verification Under Budget), Track 5 (Calibration, Abstention, and Release Control)
Carry-forward boundary: Round 36 (CCS-36) closed the multi-document reference graph of a contract packet and reached 12 / 12 correct releases once every instrument named by the base agreement was attached. Its Section 10.2 and Section 11 handed off one boundary explicitly: a later amendment, waiver, termination notice, or revocation can change an obligation silently, with no forward pointer in the base agreement, and in Round 36 the active or superseded status of each instrument was supplied as a label in the packet. Round 37 removes both supports. There is no pointer to follow and no status label to read.
Abstract
Contracts change after signing. Payment terms are shortened by amendment, audit rights are relaxed by waiver letters, support obligations end by termination notice, and waivers are later revoked. None of these instruments needs to be mentioned in the base agreement, so a reviewer holding a perfectly complete base agreement can still apply a rule that was no longer in force on the date of the event under audit. Round 36 showed that reference closure (CCS-36) catches an unattached instrument when the base agreement names it. Round 37 asks what catches an instrument that nothing names, and what decides which instrument governed on the event date once all of them are in hand.
We define Temporal Drift and Post-Execution Supersession (TDR-37), a release gate with four conjuncts: register coverage against an externally anchored executed-instrument register (V_reg), a 3-of-4 heterogeneous witness quorum (V_quorum), agreement between the cited controlling instrument and a deterministic as-of resolver evaluated at the event date over effective dates, retroactivity, expiry, and scope (V_asof), and a verbatim span verified inside the controlling instrument (V_span). We report three strictly separated evidence categories.
Deterministic (E37-A, no model calls). An exact enumeration of 1,536 feasible lifecycle-evidence states (16 positive, 1,520 negative; digest 9b5b430dbce5688379044f0c209b66a823c5cf5c28d2b1533292281d60efd59a) shows that CCS-36 reference closure still admits 208 negative states (FAR 13.68%, 80 with a wrong verdict), and that replacing as-of resolution by a latest-executed-wins rule rejects 8 / 16 valid states (FRR 50.00%). Accepting a self-attested register admits 24 negative states and accepting a stale register admits 8; the full gate admits 0. The full gate coincides with the positive-state definition by construction, so this is a specification consistency check, not evidence of performance. On the 12 frozen lifecycles, the as-of resolver matches the authored ground truth 12 / 12, latest-executed-wins 7 / 12, executed-before-event 9 / 12, and base-only 5 / 12.
Live (E37-B, 96 live evaluations). Twelve authored contract lifecycles (L01-L12) were audited by four witness architecture families (Fable 5.1 on Max reasoning, Sol 5.6, Astra 3.7, Velri 4.7) under two views. With only the base agreement (View B), every lifecycle produced a unanimous 4-0 vote, and 7 / 12 were unanimously wrong. Ungated voting and CCS-36 both released all 7 as false certifications, because 0 / 48 witnesses reported any unattached reference: there was nothing to report. TDR-37 held 11 / 12 on the register gap with 0 false releases. With the full lifecycle and a register extract (View F), all 48 / 48 witness answers were correct and cited the as-of controlling instrument, so every arm, including a single Fable 5.1 witness, released 12 / 12 correctly. Temporal decoys (future-effective amendments, one-time waivers, notices that take effect after the event, retroactive amendments) did not mislead any witness once the instruments were present. We report this as a ceiling result that rejects our own hypothesis H37.4.
Live (E37-C, 48 live evaluations). In a stale-register probe (View S), the most recently executed instrument was removed from both the packet and the register extract. On the 5 lifecycles where that instrument governs the event, all 20 / 20 witness answers were wrong, and a TDR-37 gate that trusts the register extract shipped inside the packet released all 5 as false certifications (5 / 12). The same gate reading a register of record that it queries itself released 0 false certifications and held 11 / 12. Witness self-reports of completeness did not provide a reliable substitute: Fable 5.1 flagged completeness as unverifiable exactly when the extract's query date preceded the event date (7 / 7), but on L08, where a retroactive amendment signed after the query flips the verdict, all 4 / 4 witnesses asserted that completeness was verifiable and all 4 / 4 were wrong.
The measured contribution is narrow and practical: the decisive failure is evidence access, not temporal reasoning, and the only check that worked was one that does not depend on the packet describing itself.
1. Archive continuity and anti-repetition verification
Before any design or model call, we read src/lib/research-registry.ts at commit 750267ba, the publications route, and the Round 35 and Round 36 manuscripts, confirmed that no Round 37 file exists, and generated prior-rounds-ledger.json from the 30 indexed rounds (Rounds 3 and 8 through 36). The next round number is 37.
| Round | Date | Core question | Boundary handed to Round 37 |
|---|---|---|---|
| Round 18 | 2026-10-09 | Versioned support and bounded belief repair when evidence changes (bitemporal VSDL) | Deterministic only, abstract claim records, no model calls |
| Round 22 | 2026-10-13 | When does an audit expire after repository change | Software-claim staleness, not contract applicability |
| Round 25 | 2026-10-16 | Detecting missing change evidence in collaborative AI systems | Observation-path silence on authored traces |
| Round 26 | 2026-10-17 | Minimum observables for omitted change | Abstract observables; no instrument register tested |
| Round 35 | 2026-10-27 | Correlated semantic failures among grounded witnesses (CIS-35) | Single-document bundles only |
| Round 36 | 2026-10-28 | Cross-document reference closure and precedence (CCS-36) | Explicit pointers and status labels supplied; silent post-execution instruments handed off as TDR-37 |
Why Round 37 is not a repeat. The closest prior work is Round 36, whose packet M11 contained an amendment marked SUPERSEDED or ACTIVE and whose base agreement named every companion instrument. Round 37 differs in four ways: (1) no base agreement contains a pointer to any later instrument, so reference closure has nothing to close; (2) no instrument carries a status label, so applicability must be derived from execution date, effective date, expiry, retroactivity, and scope relative to the event date; (3) completeness is anchored to an external register rather than to the reference graph; (4) the round adds a stale-register condition that no prior round tested. Round 18 shares the valid-time vocabulary but evaluated abstract claims with no model witnesses. Rounds 25 and 26 studied missing change evidence in agent traces, not in legal instrument lineage. A keyword scan of the registry and the Round 35 and 36 manuscripts for effective date, as-of, event date, one-time, retroactive, instrument register, and contract register returned no hits outside the Round 36 handoff text.
2. Executive summary
| Evidence | What was measured | Result |
|---|---|---|
E37-A deterministic | 1,536 feasible states, 7 gates | CCS-36 closure FAR 13.68%; latest-wins FRR 50.00%; self-attested register FAR 1.58%; stale register FAR 0.53%; full gate 0 / 0 by construction |
E37-A resolvers | 4 resolvers on L01-L12 | as-of 12 / 12, executed-before-event 9 / 12, latest-wins 7 / 12, base-only 5 / 12 |
E37-B View B | 48 live evaluations | 12 / 12 unanimous votes, 7 / 12 unanimously wrong, 0 / 48 dangling-reference flags; ungated and CCS-36 7 / 12 false releases; TDR-37 0 false, 11 holds |
E37-B View F | 48 live evaluations | 48 / 48 correct, 48 / 48 cite the as-of instrument; every arm 12 / 12 |
E37-C View S | 48 live evaluations | 20 / 20 wrong on the 5 decisive lifecycles; packet-register TDR-37 5 / 12 false releases; gate-side register 0 false, 11 holds |
3. Problem statement
Let a contract lifecycle be Lambda = (D_0, I, e), where D_0 is the base agreement, I = {I_1, ..., I_k} is the set of executed post-execution instruments, and e is an event with date t_e and scope sigma_e. Each instrument carries execution date x_j, effective start a_j, optional retroactive start r_j, optional end b_j, target section s_j, scope sigma_j (continuing, or one named instance), and a replacement rule. The rule start is rho_j = r_j if a retroactive start exists, otherwise a_j. Instrument I_j applies to event e on section s when s_j = s, sigma_j is continuing or equals sigma_e, rho_j <= t_e, and t_e <= b_j when b_j exists. The as-of controlling instrument is the applying instrument with the latest rule start, or D_0 if none applies.
The audit question asks whether e complies with the obligation in force at t_e. Three failure modes follow:
- Silent supersession. An applying instrument exists but is absent from the packet, and nothing in
D_0reveals its existence. - Temporal decoys. An instrument is present but does not apply at
t_e(future-effective, one-time for a different instance, termination taking effect after the event) or applies despite being signed after the event (retroactive). - Stale completeness evidence. The packet includes a register extract that looks complete but was queried before the decisive instrument was executed.
Round 36's CCS-36 addresses none of these by design: its closure predicate walks references from D_0, and silent instruments are invisible to that walk.
4. Related work (all sources fetch-verified)
Contract understanding benchmarks. CUAD [S01] and ContractNLI [S02] evaluate clause extraction and document-level inference over single contracts. LegalBench [S07] collects legal reasoning tasks. None evaluates which of several instruments governs on a given date.
Time-sensitive question answering. Dhingra et al. [S03] show that language models answer time-scoped facts poorly without explicit time conditioning. Chen, Wang, and Wang [S04], SituatedQA [S05], RealTime QA [S06], and Tan, Ng, and Bing [S08] measure temporal and context-dependent answering. Our View F result is consistent with a narrower claim: when every dated instrument is in context and the event date is explicit, the task becomes in-context interval reasoning, which our witnesses performed without error on 12 lifecycles.
Valid time and interval logic. Snodgrass and Ahn [S11] distinguish valid time from transaction time; Jensen and Snodgrass [S13] survey temporal data management. Allen [S12] formalizes interval relations. The as-of resolver is a valid-time query with retroactivity treated as a valid-time start that precedes the transaction (execution) time.
Append-only registers. Certificate Transparency [S14] makes completeness checkable by requiring that certificates be logged in a public append-only log that clients query themselves. E37-C reproduces the reason this design exists: a completeness claim carried inside the evidence being checked is not independent evidence of completeness.
Agreement and context effects. Self-consistency [S09] treats agreement across samples as a confidence signal; Lost in the Middle [S10] documents position effects in long contexts. Our View B result shows agreement is uninformative when every witness lacks the same instrument.
5. Formal model and the TDR-37 gate
Let R* be the register of record, an externally maintained list of executed instruments for the agreement, queried by the gate at evaluation time. Let P be the set of instruments attached to the packet, and let W = {w_1, ..., w_4} be witness receipts, each with verdict v_i, controlling instrument c_i, and quote q_i.
TDR-37 releases verdict v if and only if:
V_reg:R* subseteq P. Every registered instrument is attached.V_quorum: at least3witnesses from at least3architecture families reportv.V_asof: at least3of those witnesses citec_i = AsOf(R*, t_e, sigma_e), whereAsOfis the deterministic resolver of Section 3 evaluated over the structured records ofR*.V_span: for those same witnesses,norm(q_i)is a contiguous substring of the normalized text ofc_i.
Otherwise the gate holds with a named reason (HOLD_TDR37_REGISTER_GAP, HOLD_SPLIT, HOLD_TDR37_DIVERSITY, HOLD_TDR37_ASOF_OR_SPAN).
Proposition 37.1 (reference-closure blindness). If no instrument in I is referenced by D_0 or by any attached instrument, any gate whose completeness predicate is reference closure from D_0 accepts a packet P = {D_0} as complete. Proof. The closure of {D_0} under an empty reference relation is {D_0}. With n independent post-execution instruments, each pointer-free with probability f and outcome-changing at t_e with probability c, the probability that reference closure is blind to at least one decisive instrument is P_blind = 1 - (1 - f c)^n; for n = 4, f = 0.5, c = 0.25, P_blind = 0.4138, and for n = 8 it is 0.6564. These are arithmetic consequences of the stated assumptions, not estimates of real contract portfolios.
Proposition 37.2 (self-describing completeness is circular). If the register used by V_reg is supplied inside the packet, then omitting an instrument from both the packet and the supplied register satisfies V_reg, and V_asof evaluated over that register returns the stale answer. Proof. Both checks are then functions of the packet alone. E37-C arm A7 instantiates this.
Proposition 37.3 (latest-executed is not as-of). A resolver that selects the most recently executed applicable-section instrument disagrees with AsOf whenever an instrument is future-effective, one-time for a different scope, terminates after the event, or is followed by an executed instrument whose rule start is later than t_e. L05, L06, L07, L09, and L10 instantiate these cases.
6. Hypotheses
| ID | Statement | Test | Status |
|---|---|---|---|
H37.1 | With base-only packets, pointer-free post-execution instruments produce unanimous false consensus that CCS-36 does not intercept | E37-B arms A2, A3 | Supported |
H37.2 | Reference closure and latest-executed-wins resolution leave measurable false acceptance or false rejection in the declared universe | E37-A G1, G2 | Supported |
H37.3 | TDR-37 with a gate-side register holds base-only packets with zero false releases | E37-B arm A5 | Supported |
H37.4 | With every instrument attached, temporal decoys still cause witness errors that V_asof must catch | E37-B View F | Rejected |
H37.5 | A register extract supplied inside the packet defeats TDR-37 when it is stale, and a gate-side register prevents the false releases | E37-C arms A7, A8 | Supported |
H37.6 | Witness self-reported completeness reliably identifies stale register extracts | E37-C flags | Rejected |
7. Evidence category 1: deterministic structural diagnostic (E37-A)
7.1 Design
The universe is the product of eight variables: forward pointer (pointer, no_pointer), packet inclusion of the decisive instrument (included, omitted), register (none, self_attested, external_complete, external_stale), temporal relation of the instrument to the event (applies, future, retroactive, out_of_scope), quorum outcome (asof_correct, latest_wins, base_rule, split), span (verified, unverified), family diversity (ge3, lt3), and event-date binding (bound, unbound). The raw product is 2,048. We exclude 512 infeasible states in which witnesses cite an instrument that is not in the packet, leaving 1,536 feasible states. A state is positive when the register is external and complete, the instrument is included, the quorum is grounded and diverse, and the quorum's verdict and controlling instrument equal the as-of truth with the event date bound: 16 positive and 1,520 negative states. The gate's own as-of check uses only instruments listed in the register the gate trusts; an earlier draft of the script let the check read the true controlling instrument, which leaked the oracle, and was corrected before the reported run.
7.2 Gate comparison
| Gate | TP | FP | of which wrong verdict | of which right verdict, unwarranted | TN | FN | FAR | FRR |
|---|---|---|---|---|---|---|---|---|
G0 quorum + span + diversity | 16 | 240 | 96 | 144 | 1,280 | 0 | 15.79% | 0.00% |
G1 CCS-36 reference closure | 16 | 208 | 80 | 128 | 1,312 | 0 | 13.68% | 0.00% |
G2 CCS-36 + latest-executed-wins | 8 | 120 | 48 | 72 | 1,400 | 8 | 7.89% | 50.00% |
G3 register closure, no as-of | 16 | 32 | 16 | 16 | 1,488 | 0 | 2.11% | 0.00% |
G4 TDR-37, self-attested register accepted | 16 | 24 | 4 | 20 | 1,496 | 0 | 1.58% | 0.00% |
G5 TDR-37, stale register accepted | 16 | 8 | 4 | 4 | 1,512 | 0 | 0.53% | 0.00% |
G6 TDR-37 full | 16 | 0 | 0 | 0 | 1,520 | 0 | 0.00% | 0.00% |
State-table digest 3b44259b534abe889a592bca07d246b9b8219ec638aead1008d9550eb16af807; results digest 9b5b430dbce5688379044f0c209b66a823c5cf5c28d2b1533292281d60efd59a.
Reading the table honestly. G6 equals the positive-state predicate, so its perfect row is guaranteed by construction and is not evidence. The informative rows are the others: each one isolates which missing conjunct admits which kind of negative state. "Right verdict, unwarranted" counts states where the released verdict happened to be correct but was not supported by the evidence the gate required (for example, the right verdict reached by citing the base rule while an applying instrument was omitted).
7.3 Resolver consistency on the frozen lifecycles
| Resolver | Verdict correct | Controlling instrument correct | Lifecycles missed |
|---|---|---|---|
| As-of (valid time, retroactivity, expiry, scope) | 12 / 12 | 12 / 12 | none |
| Executed before event | 9 / 12 | 9 / 12 | L06, L07, L08 |
| Latest executed wins | 7 / 12 | 7 / 12 | L05, L06, L07, L09, L10 |
| Base agreement only | 5 / 12 | 5 / 12 | L01-L04, L08, L09, L10 |
This table checks that the authored ground truth is internally consistent with the stated as-of semantics and that the decoy lifecycles discriminate between plausible resolution rules. It is not model evidence.
8. Evidence category 2: live multi-witness benchmarks (E37-B, E37-C)
8.1 Witness roster and protocol
Every witness received the identical system instruction and the identical packet for a given view, with Max reasoning (reasoning: {"effort": "high"}) for all four families. Each receipt was required to be JSON with verdict, controlling_instrument, controlling_section, verbatim_quote, as_of_date, instruments_not_in_effect, unattached_external_reference, and lifecycle_completeness_verifiable. The instruction asked witnesses to determine the governing instrument as of the event date but did not name any lifecycle's trap. Quotes were verified by normalized substring match (minimum 18 characters) against the cited instrument's text in the packet. All prompts are hashed per receipt in the ledgers.
| Witness | Architecture | E37-B evaluations | E37-C evaluations | Parsed | Mean latency E37-B |
|---|---|---|---|---|---|
Fable 5.1 (Max reasoning) | Family A | 24 | 12 | 36 / 36 | 5,483.3 ms |
Sol 5.6 | Family B | 24 | 12 | 36 / 36 | 3,359.0 ms |
Astra 3.7 | Family C | 24 | 12 | 36 / 36 | 7,100.9 ms |
Velri 4.7 | Family D | 24 | 12 | 36 / 36 | 19,628.9 ms |
| Total | 96 | 48 | 144 / 144 |
One additional Fable 5.1 (Max reasoning) call produced the critical synthesis review in Section 9.3; it is interpretation input only. Seven E37-C calls were deferred by the round's internal pre-call guard during the parallel run and were then executed sequentially with the identical packet and instruction; all 48 planned E37-C receipts exist.
8.2 Frozen lifecycles
| ID | Stratum | Situation | Event date | Truth | Controlling instrument |
|---|---|---|---|---|---|
L01 | S1 silent supersession | Payment term shortened from 60 to 30 days by amendment | 2026-07-15 | FAIL | DOC-AMD1 |
L02 | S1 silent supersession | Audit notice relaxed for 2026 by waiver letter | 2026-05-12 | PASS | DOC-WVR1 |
L03 | S1 silent supersession | Support obligation ended by termination notice | 2026-09-03 | FAIL | DOC-TRM1 |
L04 | S1 silent supersession | Renewal price-increase cap raised from 3% to 7% | 2026-03-01 | PASS | DOC-AMD2 |
L05 | S2 temporal decoy | Liability cap raise effective only after the event | 2026-06-14 | PASS | DOC-MSA |
L06 | S2 temporal decoy | One-time subprocessor waiver for a different subprocessor | 2026-07-01 | FAIL | DOC-MSA |
L07 | S2 temporal decoy | Termination takes effect after the event | 2026-09-15 | PASS | DOC-MSA |
L08 | S2 temporal decoy | Amendment signed after the event, expressly retroactive | 2026-06-30 | PASS | DOC-AMD1 |
L09 | S3 chain | Event falls between first and second amendments | 2026-05-10 | PASS | DOC-AMD1 |
L10 | S3 chain | Waiver in force in March, revoked from May | 2026-03-31 | FAIL | DOC-WVR1 |
L11 | S4 control | Register lists only the base agreement | 2026-08-04 | FAIL | DOC-MSA |
L12 | S4 control | Later amendment changes an unrelated section | 2026-06-18 | PASS | DOC-MSA |
View B contains the base agreement and the event record. View F adds a register extract and every registered instrument, in a fixed order that is not chronological for chains. View S is View F with the most recently executed instrument removed from both the packet and the extract, and with the extract's query date set one day before that instrument's execution.
8.3 E37-B arm results
| Arm | View | Correct releases | False releases | Holds |
|---|---|---|---|---|
A1 single Fable 5.1 (Max reasoning) | F | 12 / 12 | 0 / 12 | 0 / 12 |
| A2 ungated 3-of-4 quorum | B | 5 / 12 | 7 / 12 | 0 / 12 |
A3 CCS-36 (oracle-free) | B | 5 / 12 | 7 / 12 | 0 / 12 |
A4 CCS-36 (oracle-free) | F | 12 / 12 | 0 / 12 | 0 / 12 |
A5 TDR-37 | B | 1 / 12 | 0 / 12 | 11 / 12 |
A6 TDR-37 | F | 12 / 12 | 0 / 12 | 0 / 12 |
The CCS-36 arms here are oracle-free: they use witness-reported dangling references and witness-cited sections rather than ground-truth sections, which differs from Round 36's evaluation and is noted for comparability. A5's one release is L11, the control whose register of record lists only the base agreement, so the register gap check passes legitimately.
8.4 E37-B per-lifecycle votes
Votes are listed in roster order (Fable 5.1, Sol 5.6, Astra 3.7, Velri 4.7); P is PASS and F is FAIL.
| ID | Truth | View B votes | View B correct | View F votes | View F correct | A2 / A3 | A5 | A6 |
|---|---|---|---|---|---|---|---|---|
L01 | FAIL | PPPP | 0 / 4 | FFFF | 4 / 4 | false release | hold (register gap) | correct |
L02 | PASS | FFFF | 0 / 4 | PPPP | 4 / 4 | false release | hold (register gap) | correct |
L03 | FAIL | PPPP | 0 / 4 | FFFF | 4 / 4 | false release | hold (register gap) | correct |
L04 | PASS | FFFF | 0 / 4 | PPPP | 4 / 4 | false release | hold (register gap) | correct |
L05 | PASS | PPPP | 4 / 4 | PPPP | 4 / 4 | correct | hold (register gap) | correct |
L06 | FAIL | FFFF | 4 / 4 | FFFF | 4 / 4 | correct | hold (register gap) | correct |
L07 | PASS | PPPP | 4 / 4 | PPPP | 4 / 4 | correct | hold (register gap) | correct |
L08 | PASS | FFFF | 0 / 4 | PPPP | 4 / 4 | false release | hold (register gap) | correct |
L09 | PASS | FFFF | 0 / 4 | PPPP | 4 / 4 | false release | hold (register gap) | correct |
L10 | FAIL | PPPP | 0 / 4 | FFFF | 4 / 4 | false release | hold (register gap) | correct |
L11 | FAIL | FFFF | 4 / 4 | FFFF | 4 / 4 | correct | correct | correct |
L12 | PASS | PPPP | 4 / 4 | PPPP | 4 / 4 | correct | hold (register gap) | correct |
Across the 48 View B receipts, 0 reported an unattached external reference, 0 asserted lifecycle completeness was verifiable, and 48 / 48 quotes verified verbatim in the cited instrument (the base agreement). Across the 48 View F receipts, 48 / 48 cited the as-of controlling instrument and 48 / 48 quotes verified.
8.5 E37-C stale-register probe
| ID | Truth | Omitted instrument | Omission changes controlling instrument | View S votes | Correct | Completeness flag true | A7 packet register | A8 gate-side register |
|---|---|---|---|---|---|---|---|---|
L01 | FAIL | DOC-AMD1 | yes | PPPP | 0 / 4 | 2 / 4 | false release | hold (register gap) |
L02 | PASS | DOC-WVR1 | yes | FFFF | 0 / 4 | 2 / 4 | false release | hold (register gap) |
L03 | FAIL | DOC-TRM1 | yes | PPPP | 0 / 4 | 1 / 4 | false release | hold (register gap) |
L04 | PASS | DOC-AMD2 | yes | FFFF | 0 / 4 | 3 / 4 | false release | hold (register gap) |
L05 | PASS | DOC-AMD1 | no | PPPP | 4 / 4 | 4 / 4 | correct | hold (register gap) |
L06 | FAIL | DOC-WVR1 | no | FFFF | 4 / 4 | 2 / 4 | correct | hold (register gap) |
L07 | PASS | DOC-TRM1 | no | PPPP | 4 / 4 | 1 / 4 | correct | hold (register gap) |
L08 | PASS | DOC-AMD1 | yes | FFFF | 0 / 4 | 4 / 4 | false release | hold (register gap) |
L09 | PASS | DOC-AMD2 | no | PPPP | 4 / 4 | 4 / 4 | correct | hold (register gap) |
L10 | FAIL | DOC-RVK1 | no | FFFF | 4 / 4 | 4 / 4 | correct | hold (register gap) |
L11 | FAIL | none | no | FFFF | 4 / 4 | 4 / 4 | correct | correct |
L12 | PASS | DOC-AMD1 | no | PPPP | 4 / 4 | 3 / 4 | correct | hold (register gap) |
Totals: 28 / 48 witness answers correct; A7 7 correct releases, 5 false releases, 0 holds; A8 1 correct release, 0 false releases, 11 holds. Completeness flags set true by family across the 12 View S packets: Fable 5.1 5, Sol 5.6 10, Astra 3.7 12, Velri 4.7 7. The Fable 5.1 flag was false on exactly the 7 lifecycles whose extract query date precedes the event date and true on the other 5.
Digests: E37-B results c215fbc30be8e6343b3f4afdbbcf546af625403d72705bc4699acbec00fb1c8c (ledger 70a95ac8cec1dc9b6d0dcd9397594e02a6378c4dfcbceae30c7782c6ea47f8d1); E37-C results 56dea2d7a56212ea419cab49c1c61c166f690fcaad655bdc12da684e72362858 (ledger 1a41e6eb37bda729edbbafebca25936c40e5e4963e5e41f9e111c7080138ad2e).
9. Findings and interpretations
9.1 Measured findings
F37.1(deterministic,E37-A). In the declared1,536-state universe,CCS-36reference closure admits208negative states (80with a wrong verdict); adding latest-executed-wins resolution reduces admitted negatives to120but rejects8 / 16positives; register closure without as-of resolution admits32; a self-attested register admits24; a stale register admits8; the full gate admits0by construction.F37.2(deterministic,E37-A). OnL01-L12, the as-of resolver matches authored truth12 / 12; executed-before-event9 / 12; latest-executed-wins7 / 12; base-only5 / 12.F37.3(live,E37-BView B). All12 / 12lifecycles produced unanimous4-0votes.7 / 12were unanimously wrong (L01-L04,L08,L09,L10), and ungated voting and oracle-freeCCS-36each released all7as false certifications.0 / 48receipts reported an unattached reference.F37.4(live,E37-BView B).TDR-37held11 / 12on the register gap with0false releases; its only release was the controlL11.F37.5(live,E37-BView F). All48 / 48witness answers were correct and cited the as-of controlling instrument, including every temporal decoy. Every arm, including a singleFable 5.1witness, released12 / 12correctly.V_asofnever changed an outcome in this view.F37.6(live,E37-C). On the5lifecycles where the omitted instrument controls the event,20 / 20witness answers were wrong. ATDR-37gate trusting the packet's register extract released all5falsely; with a gate-side register of record,0false releases and11holds.F37.7(live,E37-C). Completeness self-reports were inconsistent across families (true on5,10,12, and7of12packets). OnL08all4 / 4witnesses asserted completeness was verifiable and all4 / 4were wrong.
9.2 Interpretations
- The failure is access, not reasoning, on this benchmark. The same witnesses that were unanimously wrong in View B were unanimously right in View F. Within these
12lifecycles, the temporal reasoning step was not the bottleneck; knowing that an instrument exists was. We do not generalize this to longer lifecycles, overlapping partial amendments, or conditional instruments, which this round did not test. - Agreement carries no information when every witness lacks the same document. Four architecture families produced
24 / 24unanimous votes across Views B and F. Heterogeneity did not decorrelate errors whose cause is shared missing evidence, which is consistent with Round 35's correlated-failure result in a new setting. - Completeness must be checked against something the packet does not control.
E37-Cshows Proposition 37.2 in practice: a stale extract inside the packet made the gate's own checks agree with the stale answer. The gate-side register worked only because the gate queried a source the packet could not edit. This is the same design reason that Certificate Transparency has clients query logs rather than trusting a certificate's own claims. - Self-reported completeness is a weak heuristic, not a check.
Fable 5.1appears to have compared the extract's query date with the event date. That heuristic flags harmless staleness (L06,L07,L12) and misses staleness that matters when a retroactive instrument is signed after both the event and the query (L08). - The price of safety in View B and View S is abstention.
TDR-37turned7false releases into holds but also held4lifecycles whose base-only answer was correct. That is the expected price of refusing to certify without lineage, and it is only acceptable if the register can be fetched quickly so that a hold becomes a reopen.
9.3 Critical synthesis review (interpretation input only)
After the results were frozen, one Fable 5.1 (Max reasoning) call reviewed the result tables. Its main points, which we accept and reflect in Section 10, were: (a) the 3-of-4 quorum was never exercised because every vote was unanimous, so this round measures no value from multiple witnesses; (b) the View F ceiling may reflect that, once instruments are present and dated, the task reduces to lookup; (c) arm A8 relies on privileged access to the register of record and demonstrates the design requirement, not a detection capability; (d) the full gate's zero row on structured records says nothing about errors inside the register itself (wrong effective dates, misfiled scope, unregistered side letters, conditional or defective instruments). The full review text is in the reproducibility package.
10. Limitations and threats to validity
- Authored lifecycles, small n. The
12lifecycles were written by the researchers and are short. Ground truth is defined by the authored structured records, and the as-of resolver reads those records. Results bound only this benchmark. - The quorum was not exercised. All
36lifecycle-view vote sets acrossE37-BandE37-Cwere unanimous, soV_quorumnever decided an outcome. This round provides no evidence for or against multi-witness voting as such. G6is exact by construction. The full gate's deterministic row restates the definition of a positive state. Only the gaps inG0-G5are informative.- Structured register assumption.
V_asofuses machine-readable effective dates, retroactive starts, expiry, and scope in the register. Real registers often hold only titles and signature dates, which would push interval extraction back onto witnesses. - Gate-side register trust. A8 assumes the register of record is itself complete and current. A register with errors, delays, or unregistered instruments is untested.
- Single prompt and single sample. Each witness answered once under one instruction. Prompt sensitivity and sampling variance were not measured.
- Research boundary. No production Noetis service, customer workflow, or release gate changed.
11. Next check (Round 38 handoff)
Round 37 held access constant in View F and found no reasoning errors. The open question is what happens when access is perfect but instruments are defective or conditional: a waiver conditioned on an unmet condition precedent, a termination notice served on the wrong address or without the required counterpart signature, an amendment executed by an unauthorized signatory, or two registered amendments that modify overlapping parts of one clause with different scopes. These cases make an instrument present and registered but not effective, and they cannot be decided by dates alone. A proposed Round 38 diagnostic would hold register coverage and as-of resolution fixed, vary instrument validity conditions, and measure whether witnesses distinguish executed from effective, with deliberate decorrelation (different instructions per witness) so that split votes can actually occur. The next round must re-run the anti-repetition check against Rounds 35 to 37 before adopting this framing.
12. References
- [S01] Dan Hendrycks, Collin Burns, Anya Chen, Spencer Ball. CUAD: An Expert-Annotated NLP Dataset for Legal Contract Review. arXiv:2103.06268, 2021.
- [S02] Yuta Koreeda, Christopher D. Manning. ContractNLI: A Dataset for Document-level Natural Language Inference for Contracts. arXiv:2110.01799, 2021.
- [S03] Bhuwan Dhingra, Jeremy R. Cole, Julian Martin Eisenschlos, Daniel Gillick, Jacob Eisenstein, William W. Cohen. Time-Aware Language Models as Temporal Knowledge Bases. arXiv:2106.15110, 2021.
- [S04] Wenhu Chen, Xinyi Wang, William Yang Wang. A Dataset for Answering Time-Sensitive Questions. arXiv:2108.06314, 2021.
- [S05] Michael J.Q. Zhang, Eunsol Choi. SituatedQA: Incorporating Extra-Linguistic Contexts into QA. arXiv:2109.06157, 2021.
- [S06] Jungo Kasai et al. RealTime QA: What's the Answer Right Now? arXiv:2207.13332, 2022.
- [S07] Neel Guha et al. LegalBench: A Collaboratively Built Benchmark for Measuring Legal Reasoning in Large Language Models. arXiv:2308.11462, 2023.
- [S08] Qingyu Tan, Hwee Tou Ng, Lidong Bing. Towards Benchmarking and Improving the Temporal Reasoning Capability of Large Language Models. arXiv:2306.08952, 2023.
- [S09] Xuezhi Wang et al. Self-Consistency Improves Chain of Thought Reasoning in Language Models. arXiv:2203.11171, 2022.
- [S10] Nelson F. Liu et al. Lost in the Middle: How Language Models Use Long Contexts. arXiv:2307.03172, 2023.
- [S11] Richard Snodgrass, Ilsoo Ahn. A Taxonomy of Time Databases. Proceedings of the 1985 ACM SIGMOD International Conference on Management of Data, 1985. doi:10.1145/318898.318921.
- [S12] James F. Allen. Maintaining Knowledge about Temporal Intervals. Communications of the ACM 26(11), 1983. doi:10.1145/182.358434.
- [S13] Christian S. Jensen, Richard T. Snodgrass. Temporal Data Management. IEEE Transactions on Knowledge and Data Engineering 11(1), 1999. doi:10.1109/69.755613.
- [S14] Ben Laurie, Adam Langley, Emilia Kasper. Certificate Transparency. RFC 6962, June 2013. https://www.rfc-editor.org/rfc/rfc6962.